The CentrEngineering manufacturing holding provides comprehensive engineering and technical support (engineering) at all stages of operation, servicing, repair and modernization of gas turbine equipment (GTU, GCU, GTPP).
Engineering support for maintenance, repair and modernization projects of gas turbine units
Technical supervision
Installation supervision and commissioning
Audits and certification
// description
// areas of support
The holding's specialists provide expert participation in the key stages of the dynamic equipment life cycle:
| Area | Description |
|---|---|
| Support of factory repair | Technical supervision of defect detection, disassembly and assembly of gas generators and axial compressors (including SGT-400, LM2500 and LM6000 units). |
| Installation supervision and commissioning | On-site monitoring of correct installation, alignment, connection of auxiliary systems and the first firing of the gas turbine unit. |
| Process supervision in production | Author's supervision of strict compliance with the design documentation in the manufacture of complex-profile parts on CNC machines and in the application of thermal barrier coatings (TBC). |
| Monitoring of pilot commercial operation | Engineering support of full-scale tests of parts produced under reengineering and reverse design programs. |
// range of tasks
In the course of engineering support contracts, the holding's project teams perform:
| Task | Content |
|---|---|
| 1. Prompt design audit | Prompt approval and introduction of changes to the design documentation when hidden defects or deviations are found during repair. |
| 2. Geometry and alignment analysis | Control of precision measurements of mating equipment components and verification of rotor dynamic balancing parameters on DIAMECH-type stands. |
| 3. Metallographic and expert inspection | Assessment of the metal structure of hot section parts after etching or heat treatment to confirm their service life. |
| 4. Participation in commissions | Investigation of the causes of incidents, equipment failures or accelerated wear of components, with official technical recommendations. |
| 5. Final verification | Signing of logbooks, data sheets and certificates of equipment readiness for start-up after completion of scheduled maintenance and repair. |
Engineering support can be provided either as regular remote consulting and author's supervision, or through the permanent presence of CentrEngineering mobile engineering teams directly at the customer's production or operating site.
// product life cycle
Technical support at all stages of the product life cycle:
| Stage | Content |
|---|---|
| Development and launch | Control of prototype manufacturing, initial testing and fine-tuning of the production process. |
| Series production | Prompt resolution of current engineering problems in production, process optimization to reduce cost. |
| Operation and service | Analysis of claims, identification of the causes of equipment failures and development of recommendations for their elimination. |
| Modernization | Step-by-step improvement of product characteristics, adaptation to new market requirements or import substitution processes. |
// consulting
Consulting on design and documentation preparation:
| Area | Content |
|---|---|
| Project audit | Analysis of your drawings, 3D models and calculations for manufacturability, assemblability and compliance with the technical specifications. |
| Standardization (ESKD / ESTD) | Bringing text and graphic documents into strict compliance with GOST requirements and international standards. |
| Turnkey development | Creation of technical conditions (TC), product data sheets, operating manuals (OM) and test programs. |
| Materials consulting | Help in selecting optimal metals, alloys, polymers and components. |
// audits and inspections
An external technical audit or a state inspection will not be a source of stress for your enterprise. We will prepare your production and documents for any inspections:
| Area | Content |
|---|---|
| Customer audits | Preparing processes and documentation for the strict requirements of large corporate customers and partners. |
| Certification and licensing | Building the evidence base and document package for conformity assessment procedures (TR CU, GOST R). |
| Pre-inspection analysis | An independent “internal audit” to identify and eliminate weak points before the official commission arrives. |
| Support | Engineering support and well-reasoned defense of technical solutions directly during inspections. |
The customer receives comprehensive engineering support at all stages of the equipment life cycle, reduced technical risks during the work, timely solution of emerging engineering tasks, documented quality of the work performed and qualified support in the repair, modernization, commissioning and further servicing of gas turbine equipment.