// our cases

Current projects

 

Gas turbine engines ATS-10STM
Customer
LLC “Gazprom Transgaz Uchta”
LLC “Gazprom Transgaz Yugorsk”
Type of Works
GTE manufacture and commissioning
Current status
In process
Compressor Station “Beregovaya”
Customer
LLC “GSP Remont”
LLC “Gazprom Transgaz Krasnodar”
Blue Stream Pipeline Company B.V.
Type of Works
Technical maintenance and Repair of the equipment from CS “Beregovaya”
Current status
In process
Coastal complex
Customer
South Stream Transport B.V.
Type of Works
Technical maintenance and Repair of the equipment from the Coastal complex
Current status
In process (permanently)
Gas generator SGT-400
Customer
JSC “Cemros”
Type of Works
SGT-400 gas generator overhaul
Current status
In process
Power centre No.2 “Severo-Hosedayuskoe” oil field
Customer
LLC “SK “RUSVIETPETRO”
Type of Works
Expansion of the energy center No. 2 of the Severo-Khosedayu oil field. Manufacture, supply, installation and commissioning of GTEA12 MW
Current status
In process
Power plant of Yuzhnorusskoye oil and gas condensate field
Customer
LLC “Severneftegazprom”
Type of Works
Reconstruction of the Power Plant for own needs of Yuzhnorusskoye Oil and Gas Condensate field
Current status
In process
Gas Generator LM2500+DLE
Customer
LLC “GSP Remont”
LLC “Gazprom Transgaz Krasnodar”
Blue Stream Pipeline Company B.V.
Type of Works
Gas Generator LM2500+DLE overhaul
Current status
Completed in 2024
Gas Generator Avon 200
Customer
JSC “Tomskneft” VNK
Type of Works
Gas Generator Avon 200 overhaul
Current status
Completed in 2024
Gas Generator LM2500+DLE
Customer
LLC “GSP Remont”
LLC “Gazprom Transgaz Krasnodar”
Blue Stream Pipeline Company B.V.
Type of Works
Gas Generator LM2500+DLE overhaul
Current status
Completed in 2026
Gas turbine engines ATS-10STM
Customer
LLC “Gazprom Transgaz Uchta”
LLC “Gazprom Transgaz Yugorsk”
Type of Works
GTE manufacture and commissioning
Current status
In process
Compressor Station “Beregovaya”
Customer
LLC “GSP Remont”
LLC “Gazprom Transgaz Krasnodar”
Blue Stream Pipeline Company B.V.
Type of Works
Technical maintenance and Repair of the equipment from CS “Beregovaya”
Current status
In process
Coastal complex
Customer
South Stream Transport B.V.
Type of Works
Technical maintenance and Repair of the equipment from the Coastal complex
Current status
In process (permanently)
Gas generator SGT-400
Customer
JSC “Cemros”
Type of Works
SGT-400 gas generator overhaul
Current status
In process
Power centre No.2 “Severo-Hosedayuskoe” oil field
Customer
LLC “SK “RUSVIETPETRO”
Type of Works
Expansion of the energy center No. 2 of the Severo-Khosedayu oil field. Manufacture, supply, installation and commissioning of GTEA12 MW
Current status
In process
Power plant of Yuzhnorusskoye oil and gas condensate field
Customer
LLC “Severneftegazprom”
Type of Works
Reconstruction of the Power Plant for own needs of Yuzhnorusskoye Oil and Gas Condensate field
Current status
In process
Gas Generator LM2500+DLE
Customer
LLC “GSP Remont”
LLC “Gazprom Transgaz Krasnodar”
Blue Stream Pipeline Company B.V.
Type of Works
Gas Generator LM2500+DLE overhaul
Current status
Completed in 2024
Gas Generator Avon 200
Customer
JSC “Tomskneft” VNK
Type of Works
Gas Generator Avon 200 overhaul
Current status
Completed in 2024
Gas Generator LM2500+DLE
Customer
LLC “GSP Remont”
LLC “Gazprom Transgaz Krasnodar”
Blue Stream Pipeline Company B.V.
Type of Works
Gas Generator LM2500+DLE overhaul
Current status
Completed in 2026
    // scale

    Holding in numbers

    600
    Number of staff
    6
    Annual revenue
    in bln. Rub.
    8
    Number of
    technological sites
    9
    Number of regions
    of presence
    120
    Number of
    service staff
    70
    Number of designers
    and technologists
    280
    Number of staff
    20000
    Production area
    in m²
    60
    Number of
    equipment
    120
    Number of staff
    25000
    Production area
    in m²
    70
    Number of
    equipment
    Since 2015, the parent company of the holding LLC "CenterEngineering" has been developing gas turbines. We have an extensive number of highly qualified staff. Over the 10 years of our work, we have executed more than 60 major projects across the country.
    Holding LLC "CenterEngineering" operates across Russia. For large projects, we create special service and design units on Sites, which ensures the speed and reliability of works.
    LLC “Gazopodgotovka” is located in Saratov. The enterprise's main activity is the production of gas compressor units and gas turbine power plants.
    “Ufa Turbine Plant” LLC was opened in 2023 due to an increase in the number of orders of the holding. The company specializes in the production and repair of gas turbine engines.
      // news

      Company news

      // management

      Our team

      Berngardt
      Dmitrii Alexandrovich
      Director General
      Simonov
      Dmitrii Vladimirovich
      Deputy Director General for gas turbine equipment service
      Gaivoronskii
      Stanislav Olegovich
      Commercial director
      Bagautdinov
      Ruslan Eduardovich
      Deputy Director General for GPU/GTPP production
      Ogurtsov
      Anatoliy Sergeevich
      Deputy Director General on economics and finance
      Kisliakov
      Vladimir Leonidovich
      Technical director
      Nozdrya
      Evgenii Dmitrievich
      Chief Engineer for Service
      Naumenko
      Taras Leonidovich
      Deputy Director General on Cooperation
      Vladimirov
      Sergei Nikolaevich
      Director General Advisor
      Ulybin
      Sergei Vladimirovich
      Chief Designer on GPU and GTPP
      Geft
      Ekaterina Evgenievna
      Referent, Head of the Secretariat