CentrEngineering LLC provides design and technological support for projects in the creation, operation, servicing and repair of equipment that is part of gas compressor units (GCU) and gas turbine power plants (GTPP), as well as gas turbine engines (GTE). We guarantee an individual approach to each project and always find the best offers in terms of quality, timing and price.
// company mission
Our goal is to be a leading guide in solving complex technological challenges in the fuel and energy sector. The experience and high qualification of our team make it possible to achieve it.
Dmitry Berngardt
General Director of CentrEngineering LLC
// History
stages of development
// structure
The holding includes three enterprises, each with its own function, which allows complex tasks to be solved in a coordinated and professional way.
CENTRENGINEERING LLC
CentrEngineering LLC is the parent company of the holding, headquartered in Moscow. Over 10 years of operation the company has assembled a staff of highly qualified employees and created divisions in Kazan, Krasnodar, Stavropol and Bryansk.
SPECIALIZATION
- Operational management of the holding
- Design and technological support
- Comprehensive servicing of compressor stations
- Service and repair of foreign gas turbine engines
GAZOPODGOTOVKA LLC
The Gazopodgotovka plant designs, manufactures and commissions gas and power equipment for facilities of the oil and gas, chemical and power industries. The enterprise is located in Saratov and has a design and engineering center, its own testing facility and a unique non-destructive testing laboratory.
SPECIALIZATION
- Manufacture of gas compressor units, gas turbine power plants and booster compressor stations
- Manufacture of engine units, centrifugal compressor units, oil supply systems, filter units, exhaust systems, intake ducts and low-voltage switchgear units
- Construction and installation, supervised installation and commissioning works at facilities
UFA TURBINE PLANT LLC
UFA TURBINE PLANT LLC is an important manufacturing enterprise of the holding, located in the Republic of Bashkortostan. The enterprise focuses on the manufacture of gas turbine engines of its own design and factory repair of foreign-made dynamic equipment.
SPECIALIZATION
- Manufacture of stationary gas turbine engines with a capacity of 10 to 16 MW
- Overhaul of foreign gas turbine engines manufactured by General Electric / Siemens / Rolls Royce / Solar
- Repair of foreign-made equipment: gearboxes, screw compressors, etc.
- Reengineering of components and parts of foreign equipment
// news
Company news
24.11.2026
CenterEngineering took part in EnergyExpo-2026
The highlight of the company’s participation was the signing of a memorandum on strategic partnership and cooperation between Belenergoremnaladka OJSC (Republic of Belarus) and CenterEngineering LLC (Russian Federation).
Read more
30.10.2026
CentrEngineering presented its developments at REW-2026
The company's stand showed a model of the ATS-10STM gas turbine engine with a capacity of 10 MW, developed in-house.
Read more
14.10.2026
Overhaul of the Solar Turbines Saturn 20 gas generator has begun at Ufa Turbine Plant
The specialists face a full scope of work: disassembly of the unit, defect detection, restoration of components and parts, and subsequent assembly.
Read more
25.09.2026
Ufa Turbine Plant has completed the repair of the Siemens SGT-400 gas generator
The unit has passed 72-hour acceptance tests and has been accepted into commercial operation.
Read more
25.09.2026
The LM2500+DLE gas turbine engine has been repaired at Ufa Turbine Plant
After the repair, the gas generator has run for more than 700 hours, confirming the soundness of the technical solutions implemented.
Read more
24.11.2026
CenterEngineering took part in EnergyExpo-2026
The highlight of the company’s participation was the signing of a memorandum on strategic partnership and cooperation between Belenergoremnaladka OJSC (Republic of Belarus) and CenterEngineering LLC (Russian Federation).
Read more
30.10.2026
CentrEngineering presented its developments at REW-2026
The company's stand showed a model of the ATS-10STM gas turbine engine with a capacity of 10 MW, developed in-house.
Read more
14.10.2026
Overhaul of the Solar Turbines Saturn 20 gas generator has begun at Ufa Turbine Plant
The specialists face a full scope of work: disassembly of the unit, defect detection, restoration of components and parts, and subsequent assembly.
Read more
25.09.2026
Ufa Turbine Plant has completed the repair of the Siemens SGT-400 gas generator
The unit has passed 72-hour acceptance tests and has been accepted into commercial operation.
Read more
25.09.2026
The LM2500+DLE gas turbine engine has been repaired at Ufa Turbine Plant
After the repair, the gas generator has run for more than 700 hours, confirming the soundness of the technical solutions implemented.
Read more
08.09.2026
Ceremonial shipment of the ATS-10STM gas turbine engine
On 8 September 2026, the ATS-10STM engine was ceremonially shipped from Ufa Turbine Plant, and a time capsule was laid at the site of the new foundry.
Read more
13.07.2026
Representatives of CentrEngineering LLC took part in the diploma award ceremony for graduates of KNRTU-KAI
Read more
23.06.2026
A cooperation agreement between CentrEngineering LLC and WUXI Heyi Power System was signed at the Russia–ASEAN forum
Read more
19.06.2026
CentrEngineering LLC and Metalco Aviation Technology LTD signed a strategic cooperation agreement
Cooperation under the agreement involves the implementation of joint projects
Read more
08.06.2026
Ufa Turbine Plant took part in the “Gas. Oil. Technologies – 2026” exhibition
The event resulted in a number of preliminary agreements on further cooperation and the development of joint projects with representatives of industrial enterprises, industry associations and government bodies.
Read more
04.12.2025
XIV ST. PETERSBURG INTERNATIONAL GAS FORUM
At the industry's main annual event, in addition to presenting the current state of production of the first stationary gas turbine engine on magnetic bearings for the Russian market, the ATS-10STM with a capacity of 10 MW, CentrEngineering LLC presented the following key areas of development:
Read more
07.08.2024
Ufa Turbine Plant begins its great history in the country's economy
A film crew from the city TV channel “Vsya Ufa” visited the territory of Ufa Turbine Plant
Read more
10.06.2024
PJSC “Gazprom” and CentrEngineering LLC signed a Cooperation Agreement at SPIEF-2024
The parties will develop and manufacture a new stationary gas turbine engine with a capacity of 10 MW specifically for the needs of Russia's fuel and energy sector. In the future, engines with a capacity from 6 MW to 25 MW will be created on its basis.
Gas turbine engines of various capacities are used at compressor stations for gas production and transportation, and at energy facilities to generate electricity. The new development is planned to be used in the reconstruction of existing infrastructure and at prospective facilities.
The agreement also provides that CentrEngineering will ensure comprehensive maintenance and overhaul of the equipment of Gazprom's compressor stations.
Read more
26.05.2024
XXXII International Exhibition “Gas. Oil. Technologies”
From 21 to 24 May 2024, the XXXII International Specialized Exhibition “Gas. Oil. Technologies” was held in Ufa as part of the Russian Oil and Gas Chemical Forum.
CentrEngineering LLC presented the stationary gas turbine unit ATS-10STM with a unit capacity of 10 MW, production of which has begun at the site of Ufa Turbine Plant LLC (part of the CentrEngineering structure).
Head of Bashkortostan Radiy Khabirov thanked the heads of industry companies for their active investment, production modernization and opening of new enterprises.
Deputy Chairman of the Management Committee and Head of the Prospective Development Department of PJSC “Gazprom” Oleg Aksyutin emphasized the importance of reviving the production of industrial turbines for the oil and gas industry.
Read more
02.05.2024
World Day for Safety and Health at Work
From 24 to 26 April 2024, CentrEngineering LLC held an occupational safety competition
Read more
04.03.2024
Overhaul of PF 80D gearbox No. 6500 completed
On 1 March 2024, the Flender-Graffenstaden PF80D gearbox was accepted into commercial operation
Read more
01.12.2023
Assembly of GTK-25 I gas compressor unit completed
On 27 December the gas compressor unit was conditionally accepted into commercial operation
Read more
01.12.2023
GTK-25IR gas compressor unit accepted into commercial operation
On 13 November 2023, after successfully passing 72-hour tests, GTK-25IR gas compressor unit No. 81 at the Ivdel compressor station of Gazprom transgaz Yugorsk LLC was accepted into commercial operation
Read more
01.12.2023
Assembly of GTK-25 IR gas compressor unit completed
On 23 November 2023, assembly of GTK-25 I gas compressor unit
No. 91 at the Krasnoturyinsk compressor station of Gazprom transgaz Yugorsk LLC was completed
Read more
31.08.2023
Maintenance of the Beregovaya compressor station
CentrEngineering LLC regularly services the equipment of the compressor station to keep it in proper technical condition
Read more
30.03.2023
Overhaul of GTK-25IR gas compressor unit
In March 2023, specialists of CentrEngineering LLC began the overhaul of the GTK-25IR gas compressor unit
Read more
14.02.2023
Inspection of the LM 2500 gas generator completed
In January 2023, specialists of CentrEngineering LLC carried out a Level 1 inspection of the LM 2500 gas generator at the Beregovaya compressor station
Read more
14.02.2023
Another repair successfully completed with replacement of the DU-80L1 gas turbine engine by the PS-90GP25 engine
In December 2022, at another gas compressor unit of Gazprom transgaz Ukhta LLC at the Novonyuksenitskaya compressor station
Read more
08.06.2026
Ufa Turbine Plant took part in the “Gas. Oil. Technologies – 2026” exhibition
The event resulted in a number of preliminary agreements on further cooperation and the development of joint projects with representatives of industrial enterprises, industry associations and government bodies.
Read more
19.06.2026
CentrEngineering LLC and Metalco Aviation Technology LTD signed a strategic cooperation agreement
Cooperation under the agreement involves the implementation of joint projects
Read more
23.06.2026
A cooperation agreement between CentrEngineering LLC and WUXI Heyi Power System was signed at the Russia–ASEAN forum
Read more
13.07.2026
Representatives of CentrEngineering LLC took part in the diploma award ceremony for graduates of KNRTU-KAI
Read more
08.09.2026
Ceremonial shipment of the ATS-10STM gas turbine engine
On 8 September 2026, the ATS-10STM engine was ceremonially shipped from Ufa Turbine Plant, and a time capsule was laid at the site of the new foundry.
Read more
25.09.2026
The LM2500+DLE gas turbine engine has been repaired at Ufa Turbine Plant
After the repair, the gas generator has run for more than 700 hours, confirming the soundness of the technical solutions implemented.
Read more
25.09.2026
Ufa Turbine Plant has completed the repair of the Siemens SGT-400 gas generator
The unit has passed 72-hour acceptance tests and has been accepted into commercial operation.
Read more
14.10.2026
Overhaul of the Solar Turbines Saturn 20 gas generator has begun at Ufa Turbine Plant
The specialists face a full scope of work: disassembly of the unit, defect detection, restoration of components and parts, and subsequent assembly.
Read more
30.10.2026
CentrEngineering presented its developments at REW-2026
The company's stand showed a model of the ATS-10STM gas turbine engine with a capacity of 10 MW, developed in-house.
Read more
24.11.2026
CenterEngineering took part in EnergyExpo-2026
The highlight of the company’s participation was the signing of a memorandum on strategic partnership and cooperation between Belenergoremnaladka OJSC (Republic of Belarus) and CenterEngineering LLC (Russian Federation).
Read more
04.12.2025
XIV ST. PETERSBURG INTERNATIONAL GAS FORUM
At the industry's main annual event, in addition to presenting the current state of production of the first stationary gas turbine engine on magnetic bearings for the Russian market, the ATS-10STM with a capacity of 10 MW, CentrEngineering LLC presented the following key areas of development:
Read more
10.06.2024
PJSC “Gazprom” and CentrEngineering LLC signed a Cooperation Agreement at SPIEF-2024
The parties will develop and manufacture a new stationary gas turbine engine with a capacity of 10 MW specifically for the needs of Russia's fuel and energy sector. In the future, engines with a capacity from 6 MW to 25 MW will be created on its basis.
Gas turbine engines of various capacities are used at compressor stations for gas production and transportation, and at energy facilities to generate electricity. The new development is planned to be used in the reconstruction of existing infrastructure and at prospective facilities.
The agreement also provides that CentrEngineering will ensure comprehensive maintenance and overhaul of the equipment of Gazprom's compressor stations.
Read more
07.08.2024
Ufa Turbine Plant begins its great history in the country's economy
A film crew from the city TV channel “Vsya Ufa” visited the territory of Ufa Turbine Plant
Read more
26.05.2024
XXXII International Exhibition “Gas. Oil. Technologies”
From 21 to 24 May 2024, the XXXII International Specialized Exhibition “Gas. Oil. Technologies” was held in Ufa as part of the Russian Oil and Gas Chemical Forum.
CentrEngineering LLC presented the stationary gas turbine unit ATS-10STM with a unit capacity of 10 MW, production of which has begun at the site of Ufa Turbine Plant LLC (part of the CentrEngineering structure).
Head of Bashkortostan Radiy Khabirov thanked the heads of industry companies for their active investment, production modernization and opening of new enterprises.
Deputy Chairman of the Management Committee and Head of the Prospective Development Department of PJSC “Gazprom” Oleg Aksyutin emphasized the importance of reviving the production of industrial turbines for the oil and gas industry.
Read more
02.05.2024
World Day for Safety and Health at Work
From 24 to 26 April 2024, CentrEngineering LLC held an occupational safety competition
Read more
04.03.2024
Overhaul of PF 80D gearbox No. 6500 completed
On 1 March 2024, the Flender-Graffenstaden PF80D gearbox was accepted into commercial operation
Read more
01.12.2023
Assembly of GTK-25 I gas compressor unit completed
On 27 December the gas compressor unit was conditionally accepted into commercial operation
Read more
01.12.2023
GTK-25IR gas compressor unit accepted into commercial operation
On 13 November 2023, after successfully passing 72-hour tests, GTK-25IR gas compressor unit No. 81 at the Ivdel compressor station of Gazprom transgaz Yugorsk LLC was accepted into commercial operation
Read more
31.08.2023
Maintenance of the Beregovaya compressor station
CentrEngineering LLC regularly services the equipment of the compressor station to keep it in proper technical condition
Read more
30.03.2023
Overhaul of GTK-25IR gas compressor unit
In March 2023, specialists of CentrEngineering LLC began the overhaul of the GTK-25IR gas compressor unit
Read more
14.02.2023
Another repair successfully completed with replacement of the DU-80L1 gas turbine engine by the PS-90GP25 engine
In December 2022, at another gas compressor unit of Gazprom transgaz Ukhta LLC at the Novonyuksenitskaya compressor station
Read more
14.02.2023
Inspection of the LM 2500 gas generator completed
In January 2023, specialists of CentrEngineering LLC carried out a Level 1 inspection of the LM 2500 gas generator at the Beregovaya compressor station
Read more
01.12.2023
Assembly of GTK-25 IR gas compressor unit completed
On 23 November 2023, assembly of GTK-25 I gas compressor unit
No. 91 at the Krasnoturyinsk compressor station of Gazprom transgaz Yugorsk LLC was completed
Read more
// QMS
Quality standard
The integrated management system of CentrEngineering LLC is certified for compliance with the requirements of GOST R ISO 9001-2015, GOST R ISO 45001-2020 and GOST R ISO 14001-2016. The audit was carried out by representatives of the management system certification bodies MGT LLC (accredited in the INTERGAZCERT voluntary certification system), Quality+ JSC (accredited by the Federal Accreditation Service) and QSI (accredited in the international TURKAK certification system).
The reliability of the existing management system and its commitment to continuous improvement are confirmed by scheduled surveillance audits by the certification bodies.
THE COMPANY'S STRATEGIC OBJECTIVES IN QUALITY MANAGEMENT:
- Timely mastering of new repair and maintenance technologies for new types of equipment;
- Maintaining and improving the Company's set performance indicators and the quality of repair and maintenance of main and auxiliary equipment at the Customer's facilities;
- Increasing the satisfaction of Customers and other stakeholders with the development of the company;
- Ensuring the continuous development of the Company through systematic updating of knowledge and putting it into practice.
Certificate of compliance with GOST R ISO 9001-2015 (RU) Certificate of compliance with ISO 14001:2015 (RU) Certificate of compliance with ISO 45001:2018 (RU) Certificate of compliance with GOST R ISO 45001-2020 (RU) Certificate of compliance with GOST R ISO 14001-2016 (RU) Quality policy of CentrEngineering LLC (RU)
// Training
Training
In order to build its own competencies and consolidate the accumulated experience and knowledge potential within the enterprise, the Personnel Training Center branch was established within CentrEngineering LLC on 23 October 2023. Since 2024 the Personnel Training Center branch has been training employees in areas relevant to the enterprise.
Main objectives:
- Meeting the Company's need for qualified personnel by organizing training under additional professional advanced training programs, taking into account the requirements of the modern level of production development;
- Creating the conditions necessary for acquiring professional competencies, including for working with specific equipment, technologies, hardware and software and other professional tools.
// Documents
Open information
CentrEngineering LLC follows a policy of transparency and openness. In accordance with the legislation of the Russian Federation, we make information about the enterprise's activities publicly available.
Opinion of Gazprom Gaznadzor LLC on the organizational and technical readiness of the company (DTOiR) (RU) Certificate of attestation of the non-destructive testing laboratory (RONKTD) (RU) Certificate of attestation of the non-destructive testing laboratory (SDANK) (RU) Certificate of registration of the electrical laboratory (1 kV) (RU) Certificate of registration of the electrical laboratory (10 kV) (RU) Extract from the SRO register dated 31 March 2026 (RU) Extract from the Ministry of Emergency Situations license register dated 14 April 2026 (RU) Summary sheet of the special assessment of working conditions and summary list of measures, 2025 (RU) Summary sheet of the special assessment of working conditions and summary list of measures, 2024 (RU) Summary sheet of the special assessment of working conditions and summary list of measures, 2023 (RU) Personal data processing policy (RU)